A bathroom is small, wet, and unforgiving. Tile that is a little off, a shower pan that is a little flat, a fan that was never vented: every one of those shows up later. We build them right the first time.
What a bathroom remodeling looks like with Trulli.
Most of the bathrooms we open up around Pittsburgh still have their original tile, a tub nobody uses, and a vanity that fights the door. We take the room back to bare walls, fix what is behind them, and build it back with a layout that makes the space work harder. Tile goes in level and spaced, fixtures go in plumb, and the room gets a final clean before it is called done.
Included
Tub-to-shower conversions and walk-in showers
Wall and floor tile, set level and spaced
Vanities, mirrors, and storage
Glass shower doors and modern fixtures
Ventilation fans and lighting
Demo, haul-away, and final clean
From Our Job Sites
Build / Tile going inFinish / Same shower, doneDemo / Back to the wallsFinish / Glass shower doorFinish / Vanity and tile floorFinish / Black hex tile
Questions
Before you call.
Can you turn our tub into a walk-in shower?
Yes. Tub-to-shower conversions are one of the most common bathroom jobs we do. Vic will tell you at the walkthrough what your space allows.
How long will we be without the bathroom?
It depends on the scope. You get a straight answer on the schedule before work starts, not after demo.